Click here to make tpub.com your Home Page

Page Title: FLTS SHUT DOWN
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2885-12/NAVA1R 16-35TS361 4-1
CM SET TEST
3-13.  Perform flight line test of CM set per instructions contained in chapter
3 of TM 11-5865-202-12.
FLTS
SHUT
DOWN
3-14.
Secure from test by performing the following additional steps:
a.
Set STBY/OPR toggle to STBY.
Set ON/PWR toggle to PWR (off).
b.
c. Turn off CM set in accordance with TM 11-5865-202-12, chapter 3.
d.
Disconnect cables W1, W2, and W3.
e.  Reinstall transmitter 1A1 and receiver 1A3 assemblies in the cover of
the FLTS.
f.
Place the cables in storage space provided in the cover of the FLTS.
Reinstall cover of the FLTS on the video assembly 1A2.
g.
3-21

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business