Click here to make tpub.com your Home Page

Page Title: ASSEMBLY AND PREPARATION FOR USE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 1-6625-735-14
2.4.
ASSEMBLY AND PREPARATION FOR
ment has been damaged, report the dam-
USE.
age on SF 364 in accordance with
instructions in AR 735-11-2.
a.
When received, SSLTS is packaged in two cor-
rugated cardboard cartons. The cable case assembly
(2)
Check the equipment against the compo-
carton is 78.74 cm (31 inches) long by 58.42 cm (23
nent listing and the packing slip to see if
inches) wide by 33.02 cm (13 inches) deep. The vol-
the shipment is complete. Report all dis-
ume of the carton is 0.16 cubic meters (5.4 cubic feet).
crepancies per instructions of DA Pam
The total weight of the carton when packed for ship-
738-750. The equipment should be
ment is about 24.3 kg (54 pounds). The test set carton
placed in service even though a minor
is 68.58 cm (27 inches) long by 55.88 cm (22 inches)
assembly or part that does not affect
wide by 48.26 cm (19 inches) deep. The volume of
proper functioning is missing.
the carton is 0.19 cubic meters (6.5 cubic feet). The
(3)
Check to see whether the equipment has
total weight of the carton when packed for shipment is
been modified. (Equipment that has been
about 26.5 kg (59 pounds). A typical shipping carton
modified will have the MWO number on
and contents are shown in Figure 22.
the front panel, near the nomenclature
plate.) Check also to see whether all cur-
b.
Removing Contents.
rently applicable MWOs have been
applied. (Current MWOs applicable to
(1) Cut or remove gummed tape from top of
the equipment are listed in DA Pam
carton, and open top of carton.
310-1.)
(2) Remove polyethylene cushioning mate-
OPERATION PROCEDURE.
rial from top of carton.
Test set, stabilization system will operate in the heli-
(3) Lift carrying case from carton and
copter environment by connecting the test set to the
remove remaining polyethylene cushion-
SAS/FPS computer, either or both stabilator amplifi-
ing material.
ers, and/or the SAS amplifier. Follow the instructions
c.
provided  in
TM  11-1520-250-20,
Checking Unpacked Equipment.
MH60K
TM 11-1520-237-23 or
UH60L
UH60A
NOTE
TM 11-1520-249-23-2.
EH60A
To open the test set, release air pressure
LOCALLY MADE TEST CABLE.
by opening the air release valve.
Locally make test set cable for operational checkout.
Instructions for manufacture of locally made test cable
(1) Inspect the equipment for damage
are listed in Appendix D.
caused during shipment. If the equip-

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business