MAINTENANCE OPERATIONS
These instructions provide the proper technique and detailed procedures required to perform the maintenance
operations. Each maintenance operation provides step-by-step instructions in the order in which the work is most
logically accomplished. Any unusual or critical steps are covered in detail.
4-3.
TOOLS AND TEST EQUIPMENT LIST
For authorized tools and test equipment refer to Appendix B.
4-4.
REPAIR PARTS
Repair parts are listed in the Repair Parts and Special Tools List (RPSTL), APPENDIX C, of this manual.
Section II. Service Upon Receipt
4-5.
GENERAL
a.
Visually check the exterior of the Pitot and Static Systems Tester for apparent damage. Check contents to
assure that all components listed in APPENDIX C (RPSTL) of this manual are enclosed and undamaged.
b.
If the equipment has been damaged, report the damage on SF 368, (REPORT OF DISCREPANCIES). Check
the equipment against the packing slip to see if the shipment is complete. Report any discrepancies in
accordance with the instructions of DA PAM 738-751.