Click here to make tpub.com your Home Page

Page Title: Chapter 4. ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6625-2691-13&P
ORGANIZATIONAL MAINTENANCE
INSTRUCTIONS
Section I. SERVICE UPON RECEIPT OF MATERIEL
4-3. Inspecting and Servicing
4-1. Unloading the Equipment
The test set is shipped fully assembled, crated and
WARNING
Do not connect the test set to power
blocked.
source until all initial inspection pro-
4 - 2 . Unpacking the Equipment
cedures have been carried out.
a. General. For shipment, the test set is normally
a. After unpacking, the test set should be checked
using the following inspections:
packed in a crate.
(1) Check chassis for possible damage.
b. Unpacking
(2) Inspect interior components for damage.
(1) Remove all crating and weather resistant
(3) Check for loose electrical or hardware connec-
wrapping.
tions.
(4) Clean the unit for any foreign material which
(2) Remove internal cushioning and the dessicants
may interfere with operation.
used to remove moisture in transit.
NOTE
Correct any deficiency when first noted.
CAUTION
Exercise care while uncrating to avoid
b. Perform the quarterly preventive maintenance
damaging the test set.
service table, 4-1.
(3) Check the equipment against the packing list
4-4. Installation
and report all discrepancies to direct support mainte-
Refer to paragraph 2-3 for information on the in-
stallation of the equipment.
nance personnel.
Section Il. MOVEMENT TO A NEW WORKSITE
link to storage position.
4 - 5 . Dismantling for Movement
b. Inspect interior components for security mount-
Disconnect the test set from its power source before
ing.
removing parts or assemblies. Follow the following pro-
c. Close all doors and cover seams with pressure sen-
cedure for dismantling the test set in preparation for
moving to a new worksite.
sitive waterproof tape.
d. Remove mounting bolts or tie down rods, cables or
a. Disconnect the load as follows:
lashings that fasten test set down.
(1) Rotate the variable load control knob (fig. 4-1)
e. Enclose the unit in a water resistant barrier and
full counterclockwise.
seal.
(2) Place all fixed load switches in "OFF" position.
f. Encase the unit in a strong wooden crate or box.
(3) Stop tested equipment.
Block the unit to prevent shifting.
(4) Remove input leads. Secure copper shorting

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business