Click here to make tpub.com your Home Page

Page Title: Figure 2-3. Starting instructions.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6625-2691-13&P
OPERATING INSTRUCTIONS
STARTING
1. OPEN BOTH SIDE DOORS.
2. CONNECT VOLTAGE PLUG TO DESIRED VOLTAGE RECEPTACLE.
3. WITH INPUT POWER "OFF" *CONNECT INPUT POWER LEADS TO
POWER TERMINALS AND GROUND TERMINAL.
4. TURN VOLTAGE SELECTOR SWITCH TO DESIRED POSITION.
5. CHECK VOLTAGE PLUG AND POWER TERMINAL CONNECTIONS
TO CORRESPOND WITH INPUT VOLTAGE AND PHASING.
6. TURN "ON" INPUT POWER.
7. TURN "ON" MASTER SWITCH, FANS SHOULD OPERATE.
8. OPERATE LOAD SWITCHES FOR DESIRED LOAD.
TS 025328
Figure 2-3. Starting instructions.
2-7. Stopping the Equipment
Refer to figure 2-4 and stop the test set.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business