Click here to make tpub.com your Home Page

Page Title: Section Ill ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2975-12
3-4. PRELIMINARY SERVICING AND ADJUSTMENT. (CONT)
Test set is shipped from factory wired for 115 vat, 50/60 Hz operation. The input power identification
plate, located on the back of test set, should state this.
Test set can operate on 230 vac, 50/60 Hz input power when input wiring is changed. This is done at
next higher level of maintenance.
Plug power cable assembly into ac connector.
CAUTION
Before plugging power cable assembly into standard 115 vac outlet, make sure POWER
switch is in OFF position and check fuse F1 for correct rating for selected operating
voltage. To check fuse, do the following:
1. Press in on extractor fuse holder and rotate counterclockwise to unlock.
2. Pull extractor fuse holder and fuse F1 out of fuse holder.
3. Remove fuse F1 and inspect for correct rating.
NOTE
For 115 vac operation, fuse F1 must be rated at 4 amp, 120 v.
For 230 vac operation, fuse F1 must be rated at 2 amp, 250 v.
4. Install correct fuse F1 in extractor fuse holder.
5. insert fuse F1 and extractor fuse holder in fuse holder.
6. Push in on extractor fuse holder and rotate in a clockwise direction to lock in place.
Section Ill ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND
SERVICES (PMCS)
Page
Para
Subject
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Organizational Preventive Maintenance Checks and Services .. . . . . . . . . . . . . . . . . . . . 3-6
Blower Filter Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cleaning and Touchup Painting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  3-8
3-5. GENERAL.
To keep test set in proper operating condition, the following checks must be performed:
1. inspect test set for scratches and worn or bare spots.
2. Clean test set on a routine basis or whenever cleaning becomes necessary (para 3-8).
3. Check for frayed cables, loose, missing, or damaged parts.
3-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business