Click here to make tpub.com your Home Page

Page Title: Section V. DIRECT SUPPORT TESTING PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2937-13
Section V. DIRECT SUPPORT TESTING PROCEDURES
(3) Detergent.
5-23.  General
(4) Fine bristle brush.
This section contains testing and inspection procedures
(5) Fine sandpaper.
for use by direct support maintenance personnel to
(6) Tool Kit, Electronics Equipment TK-105/G.
determine  whether  the  performance  of  repaired
b.  Procedure. Inspect the components of the test
equipment is satisfactory for return to users. Procedures
set group as described in table 5-3.
for performing physical inspection, unit functional tests,
WARNING
and cable continuity checks are given.  Follow the
procedure steps in the order given and set all controls
Adequate ventilation should be provided while
accurately when performing these procedures.
using
TRICHLOROTRIFLUOROETHANE.
Prolonged breathing of vapor should be avoided.
The solvent should not be used near heat or
5-24.  Tools and Test Equipment Required for
open flame; the products of decomposition are
Direct Support Testing
toxic
and
irritating.
Since
The tools and test equipment required for direct support
TRICHLOROTRIFLUOROETHANE
dissolves
maintenance are the same as those listed in paragraph
natural oils, prolonged contact with skin should
5-7.
be avoided. When necessary, use gloves which
the solvent cannot penetrate. If the solvent is
5-25.  Physical Tests and Inspection
taken internally, consult a physician imrnediately.
a. Tools and Materials Required.
(1)  Cleaning compound (Trichlorotrifluoroethane).
(2) Cleaning cloth.
Table 5-3. Physical Inspection Procedure
Item to be inspected
Procedure
Standard
Inspect interior and exterior surfaces for dust,  All surfaces free of dust, dirt, grease or fungus
Interior and exterior surfaces.
dirt, grease or fungus. Clean all surfaces as
required.
Painted surfaces
Inspect interior and exterior surfaces for  Painted surfaces free of chipped areas and all
chipped paint or corrosion.
surfaces corrosion free.
Wiring and insulation.
Inspect internal wiring for breaks and frayed or  No broken wiring and insulation undamaged.
damaged insulation.
Connectors or sockets.
Inspect connectors for broken pins or sockets  Connector pins or sockets unbroken and
and damaged threads.
treads undamaged
Inspect  components  and  assemblies  for  All components and assemblies complete and
Cornponents and assemblies
breakage completeness and indications of  undamaged.
overheating.
to the depot for repair. The procedures should also be
5-26.  DS Testing of Control-interface Unit Following
helpful in cases where multiple faults exist in the unit.
repairs, functionally test the control-interface unit as
b. Toots and Test Equipment Required. The
described in paragraph 5-7 and table 5-1.
tools and test equipment required for circuit card go/no-
5-27.  DS Testing of Digital Tester Following repairs,
go testing are listed below.
functionally test the digital tester as described in TM 11-
Test equipment
Common name
6625-2591-13.
5-28.  Cable Assembly Testing Cable assembly
Test Set, Electronic Systems
Control-interface unit
testing consists of making continuity checks to isolate a
TS-3796/- UKM-4
defective wire path or cable assembly.
Test Set, Electronic Systems
AN/UYM-7
Digital tester
a. Test Equipment and Materials.
Data recording-programmed
AN/USM-223.
magnetic cards as follows
b. Test  Connections  and Conditions.
None
SM-A-942475
A1 program card
required.
SM-A-942480-1
A2 program card no.1
SM-A-942480.2
A2 program card no 2
c.  Initial Test Equipment Settings. None required.
SM-A-942485-1
A3 program card no 1
d. Procedure.  Use Multimeter AN/USM-223 and
SM-A-942485-2
A3 program card no.2
wire lists given in tables 5-4 through 5-8 when performing
SM-A-942485-3
A3 program card no 3
cable assembly testing.
SM-A-942485-4
A3 program card no.4
SM-A-942510
A5 program card
5-29.  Circuit Card Go/No-Go Testing
SM-A-942495-1
A6 program card no.1
a. General. The test procedures in the following
SM-A-942495-2
A6 program card no 2
subparagraphs are used as an aid in isolating faults in
SM-A-942495-3
A6 program card no.3
the control-interface unit to a particular circuit card,
SM-A-942520-1
A7 program card no 1
SM-A-942520-2
A7 program card no 2
chassis mounted part, or to circuit card assembly rack I
A2.
These procedures will also provide positive
identification of faulty circuit cards prior to returning them
5-16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business