Click here to make tpub.com your Home Page

Page Title: CONTROL AND POWER DISTRIBUTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2884-30/NAVAIR 16-35TS3615-2
CONTROL AND POWER DISTRIBUTION (Continued)
115 Vac Power Distribution to the Bench Test Set and Blowers.
a.
115 Vat, 60 Hz Power Cable W6 connects 115 Vac to input power 115
(1)
VAC, 60 Hz jack J5.
Filters, FL1 and FL2 provide electromagnetic interference EMI inte-
(2)
grity.  The line filters eliminate conductive interference from the
BTS.
When circuit breaker CB2 is enabled 115 Vac is applied to Blowers B1
(3)
and B2.
Centrifugal Blower B1 when enabled delivers cooling air to LRU-1 at
(4)
145 CFM at a nominal motor speed of 3150 RPM.
Tubeaxial Fan B2 when enabled delivers cooling air to the BTS cabi-
(5)
net at 110 CFM at a nominal motor speed of 3250 RPM.
The 115 Vac, 60 Hz, single phase feeds Control Panel Assembly 1A1,
(6)
and is distributed through Jack J7 to:
1A4
RF MODULATION ASSEMBLY

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business