| |
TM 55-4920-412-13&P
CHAPTER 3
OPERATING INSTRUCTIONS
Section I. CONTROLS AND INSTRUMENTS
3-1. Operator's Controls.
All operator's controls, indicators and connectors are
shown in Figures 3-1 and 3-2 and listed and described in
Table 3-1.
Section II. OPERATION UNDER USUAL CONDITIONS
3-2. Preliminary Starting Procedure.
a. Place simulator INPUT POWER switch OFF.
NOTE
Only one of the three units to be
tested can be connected to the test
set
at
one
time.
Test
setup
diagrams
and
typical
testing
procedures
are
given
for
each
situation.
b. Connect unit to be tested to test set (Figures 2-2
through 2-5).
3-3. Operating Procedure.
Do an operational check of Vertical Instrument Display
System (TM 55-1520-237-23-3).
3-4. Procedures for Shutdown.
a. Place simulator INPUT POWER switch OFF.
b. Disconnect test set and other test equipment.
3-1
|