| |
TM 55-4920-412-13&P
CHAPTER 2
SERVICE UPON RECEIPT
Section I. SITE AND SHELTER REQUIREMENTS
2-1. Siting.
The test set operates in the bench environment and
requires the availability of 28 vdc and 115 vac, single-
phase, 400 Hz power.
Section II. SERVICE UPON RECEIPT OF MATERIEL
2-2. Unpacking.
a.
Packing Data. When received, the Vertical
Instrument Display System Bench Test Set is packaged
in a fiberboard carton. A typical shipping carton and
contents are shown in Figure 2-1. The carton is
59.69cm (23 1/2 inches) long x 57.15cm (22 1/2 inches)
wide x 52.07cm (20 1/2 inches) deep. The volume of the
carton is 0.2 cubic meter (62 cubic feet) and the total
weight when packed for shipment is 35.1kg (78 pounds).
b.
Remove Contents.
(1)
Cut or remove the gummed tape from top
of carton and open top of carton.
(2)
Remove polyethylene cushioning material
from top of and from around test set.
(3)
Lift test set from carton and remove
remaining polyethylene cushioning material.
2-3. Checking Unpacked Equipment.
CAUTION
To open the test set, release air
pressure by opening the air release
valve.
a.
Inspect equipment for damage caused during
shipment. If equipment has been damaged, report
damage on DD Form 6 in accordance with instructions in
AR 700-58.
b.
Check equipment against component listing in
operators' manual and packing slip to see if shipment is
complete. Report all discrepancies in accordance with
the instructions of DA PAM 738-751. Equipment should
be placed in service even though a minor assembly or
part that does not affect proper functioning is missing.
c.
Check to see whether equipment has been
modified. (Equipment which has been modified will have
MWO number on front panel, near nomenclature plate).
Check also to see whether all currently applicable
MWOs have been applied. (Current MWO applicable to
equipment are listed in DA PAM 25-30.
Change 1 2-1
|