• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section II. MAINTENANCE ALLOCATION CHART-Continued
Section II. MAINTENANCE ALLOCATION CHART-Continued

Maintenance Manual For Control Unit, Alarm Set C-9412/Fss-9(V) -11 Page Navigation
  74    75    76    77    78  79  80    81    82    83    84  
img
TM 5-6350-264-14&P-11
NAVELEX EE 181-AA-OMI-12A/E121 C-7359-60-1
T.O. 31S9-2FSS9-1-11
Section II. MAINTENANCE ALLOCATION CHART-Continued
(6)
(1)
(2)
(3)
(5)
(4)
TOOLS
MAINTENANCE LEVEL
MAINTENANCE
COMPONENT/
REMARKS
GROUP
AND
FUNCTION
ASSEMBLY
NUMBER
EQUIPMENT
C
O
F
H
D
03
Monitor Cabinet
Inspect
0.5
(Type C)
Test
0.7
Repair
1.5
Replace
2.0
Battery
Inspect
0.1
1.
Test
0.5
Replace
0.5
Signal Module
Test
0.5
1.
Repair
0.5
Replace
0.7
Status Indicator
Test
0.5
Replace
0.7
Connector
Test
0.2
1.
Replace
0.5
Power Supply
Test
0.4
1.
Replace
0.9
Repair
0.7
Change 1 B-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.