Click here to make tpub.com your Home Page

Page Title: Preoperational Checks and Adjustment.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-6680-316-10
2-3. Preoperational Checks and Adjustment.
(cent)
a. Airflow Tester (cont)
q Release four catches (6) and remove
cover (3) from carrying case (5). Lay cover
aside.
q Make sure that adapter (7), orifice
assembly (1), plastic tube (2), and pressure
gage (4) are present.
q Make sure that plastic tube (2) is con-
nectedto orifice assembly (1) and pressure
gage (4). If disconnected, attach tube to
orifice assembly or pressure gage.
q Inspect plastic tube (2) for splits and
cracks.
2-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business