given in table 2-8 below. Only the switch wafers
2-20. Signal Paths (Operator's PMCS chart)
that perform a specific function for the test being
of CIRCUIT SELECTOR Switches
performed are listed. The TEST NAME columns
The operator's PMCS chart in TM 11-6625-467-12
show the setting and function of each switch wafer.
specifies various selfchecks for the test set. Func-
T h e RF JUMPER CABLE column describes the
tional tests in the operator's PMCS chart test the
function of RF jumper cables connected as part of
eight oscillator circuits and the distortion detector.
the test. If additional information for any other CIR-
The CIRCUIT SELECTOR switch settings for these
CUIT SELECTOR switch setting is needed, refer
tests and the function of each CIRCUIT SELECTOR
to figure FO-3.
switch wafer for each self-test switch program are