|
|
TM 11-6625-2976-40
2-5.
PERFORMANCE TEST PROCEDURES. (CONT)
6. Set test set controls as indicated in the following table,
KEY
CONTROL/SWITCH
POSITION/SETTING
1
BATTERY PWR
OFF
2
MKR BCN PWR
OFF
3
GLIDE SLOPE PWR
OFF
4
GLIDE SLOPE UP/OC/DOWN
OC
5
LOC PWR
OFF
6
LOC LEFT/OC/RIGHT
OC
7
LOC 1020 HZ
OFF
8
VOR PWR
OFF
9
VOR 1020 HZ
OFF
10
VOR bearing
000
11
ATTEN controls (both)
0
8. Turn power supply power switch to off position and set voltmeter to correct scale (8 vdc
measured).
2-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |