Click here to make tpub.com your Home Page

Page Title: OVERALL OPERATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2976-40
1-13. GENERAL. (CONT)
OVERALL OPERATION
Two rechargeable internal batteries supply operating voltage to test set circuits. The battery check
circuit, when activated, indicates whether or not batteries need recharging. The front panel controls
select the test set's operational mode by:
1. Providing a path for operating voltage through circuit card assembly A6 to selected rf modules.
2. Controlling the input frequencies provided by circuit card assembly A6 for appropriate rf
modules.
The logic and control circuitry in circuit card assembly A6 directs and applies operating voltage to rf
modules selected by the control panel switch settings. This circuitry also generates modulation
signals used by rf modules to develop appropriate rf frequencies.
The test set contains five rf modules, as follows:
1.
MB RF Module A1
GS/UHF RF Module A2
2.
GS/NHF RF Module A3
3.
LOC RF Module A4
4.
VOR RF Module A5
5.
1-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business