|
|
TM 11-6625-2937-13
ing of the test set group are required to property maintain
(3) Replace foam packing in test case cover.
desert-operated equipment.
(4) Replace cover plate inside of test case
b. Operation Under Emergency Conditions. In
cover and secure with four fasteners.
(5) Obtain assistance and carefully place
the event of a digital tester failure the control-interface
control-interface unit in main body of test set case.
unit may be operated to supply power to an encoder or
(6) Replace foam packing on top of control-
decoder for unit BIT or analog circuit card testing.
interface unit.
2-7.
Preparation for Movement
(7) Obtain assistance and carefully replace
a. Preparation of Data Link Tester for
cover on test set case.
Movement.
To prepare the data link tester for
(8) Secure cover to test set case with quick
movement, refer to figure 2-1 and proceed as follows:
release cover latches.
(1) Disconnect all connecting cables.
b.
Preparation of Digital Tester for Movement.
(2) Place and secure cables WI through W4,
Repack and store accessories of the digital tester in
three extender cards, card edge connector, ballast, coax
accordance with TM 11-6625-2951-13.
adapter and dummy load in test set case cover.
2-13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |