Click here to make tpub.com your Home Page

Page Title: Chapter 2. INSTALLATION AND OPERATING INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2937-13
CHAPTER 2
INSTALLATION AND OPERATING INSTRUCTIONS
Section I. SERVICE UPON RECEIPT AND INSTALLATION
(1) Unfasten eight quick release cover latches.
2-1.
Unpacking
(2) Obtain assistance and carefully remove
The following subparagraph describe the unpacking
cover containing accessories from test set case.
procedure for the test set group.
(3) Remove foam packing from top of test set
a.  Data Link Tester (fig. 2-1). All units of the
case.
data link tester are packaged for shipment or limited
(4) 0btain assistance and carefully remove
storage in the test set case (fig. 2-1) (art of data link
control-interface unit from test set case.
tester). The teat set case is 31 inches high, 28 inches
(5) Press four quick release fasteners and
wide and 24 inches in depth. The total packaged weight
remove cover plate from Inside of cover.
of the data link tester with all accessories is 125 pounds.
(6) Remove foam packing inside of cover.
To remove the control-interface unit, extender cards and
(7) Remove extender cards, cable assemblies,
cable assemblies from the test set case, proceed as
edge connector, ballast, coax adapter and dummy load
follows:
from cover.
WARNING
Before unpacking the data link tester
press the RELIEF VALVE on the front of
the test set case to relieve static
pressure.
2-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business