| |
SECTION A
(1) ASSEMBLY PROCEDURE:
NOTE :
Unit is partially disassembled to fit into preformed
carton for shipping.
TO REASSEMBLE: (See diagram K16200 Electric P.M. Tester)
Components numbered on Diagram K16010, K16020. (-3 -11),
(-3 -6) & (-8 -1) have been disassembled for shipping.
(A) Place the mechanical top (K16010) into the cup
(K16020) and place on Air Bath.
(B)
Install the main gas pipe (-3 -6) into the 1/4
pipe tee using a 3/4 Hex open end or adjustable wrench only,
(DO NOT USE PIPE WRENCH) and tighten securely.
(C) Place the CUP holder (-3 -11) on the main gas
(-3 -6) at a convenient height and tighten thumb screw.
(D)
Install the support rod (-8 -1) into the base
tighten set screw in base (-0 -1) to secure rod.
pipe
and
(E) Install the stirrer motor on the support rod (-8 -1).
(F) Connect the flex cable from the mechanical top to the
motor and adjust the motor to the angle shown in diagram.
(G) Connect gas inlet to any regulated low pressure
(5-10 p.s.i.) gas supply (such as L.P.G. or natural gas). Do
not use direct unregulated pressure from an L.P.G. tank.
Unit is now ready for operation.
Proceed to instructions page
(1).
|