| |
TM 1-4920458-13&P
Section VI. Preparation For Storage Or Shipment
SECTION CONTENTS
PARA
PAGE
PREPARATION FOR STORAGE
3-17
3-14
PREPARATION FOR SHIPMENT
3-18
3-14
3-17.
PREPARATION FOR STORAGE
The Pitot and Static Systems Tester may be stored using normal procedures. Instructions are provided in TM1-1500-
204-23 (series). The case is drip proof when lid is closed and secured.
3-18.
PREPARATION FOR SHIPMENT
Preservation and packaging shall be level A or Level C. Packing shall be Level A, Level B, or Level C of Specification
MIL-P-116.
3-14
|