Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-7. SHUTDOWN PROCEDURE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 1-4920-458-13&P 2-7. SHUTDOWN PROCEDURE To  disconnect  instrument  under  test  and  shut  down  Tester:  After  test,  open  applicable  "bleed"  needle  valve  until  all instruments read zero. CAUTION Do not turn selector valves, or disconnect hoses from test set unless all instruments indicate zero; failing to will cause damage to instruments. a. Turn power switch to OFF position. b. Close shut-off valves on top of operator panel to OFF positions. c. Disconnect instrument under test from appropriate "Pitot" or "Static" port on rear of Tester. d. Set  "Vacuum"  and  "Pressure"  selector  valves  to  OFF  positions  and  open  four  vacuum  and  pressure  "Control" and "Bleed" needle valves. e. Disconnect Tester from power source. f. Return power cables, hoses, adapters, and fittings to accessory storage compartment and return cover to tester. 2-10

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business