| |
TM 1-4920-458-13&P
APPENDIX E
MANUFACTURED ITEMS LIST
E-1.
GENERAL
This appendix contains the procedures for fabricating the manufactured items you are authorized to make.
E-2.
WIRING - MANUFACTURE
This task covers: Fabrication
Personnel Required:
MOS 68F Aircraft Electrician
FABRICATION:
a.
Cut a suitable length of wire from a spool of bulk wire.
NOTE
Be sure the wire you cut is the same gage as the wire you are replacing. Identify wire by
using color coded tape, the same color as the wire you are replacing.
b. Note what type and size of connector the old wire had and match them for the new wire.
c. Measure the length of the old wire. When cutting the new wire, add 6 in. to this length.
NOTE
If splicing a wire, use heat shrink tubing over spliced area.
d.
Fasten the first connector splice to one end of the wire.
NOTE
Check new wire for continuity before installation.
e.
Install the wire, following the path of the old wire as much as possible.
f.
Fasten the wire in place with tape, nylon ties or shrink wrap.
g.
If wire is spliced and heat shrink tubing is used, shrink tubing using a suitable heat source.
E-1/(E-2 blank)
|