Click here to make tpub.com your Home Page

Page Title: Chapter 2. SERVICE UPON RECEIPT AND INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

ARMY TM 5-6675-309-14
MARINE CORPS TM 08840A-14/1
SERVICE UPON RECEIPT AND INSTALLATION
Section I. SITE AND SHELTER REQUIREMENTS
2-1. General. This section describes site and shelter
5 or a permanent installation that has +28V and
requirements for the PSTS.
variable 0 to +40V power can be used for PSTS
operation.
2-2. Site and Shelter Requirements. The PSTS is de-
signed for operation in a sheltered maintenance shop.
The Semitrailer-Mounted Electronic Shop Set Number
Section Il. SERVICE UPON RECEIPT OF MATERIEL
2-3. Unpacking Instructions.
report the damage on DD Form 6 (Packaging Improve-
ment Report).
b. Check the equipment against the component
listing in Appendix B and the packing slip to see if the
The PSTS is made up of delicate elec-
shipment is complete. Report all discrepancies in ac-
cordance with paragraph 1-2. The equipment should be
tronic equipment. Be extremely careful
when removing each item from container.
placed in service even though a minor assembly or part
that does not affect proper functioning is missing.
a. The items comprising the PSTS are packaged in
c. Check to see whether the equipment has been
two containers. One container holds the transit case
modified. (Equipment which has been modified will
with the PSTS. The other container holds the transit
have the MWO number on the front panel, near the
case with cable assemblies and maintenance manual.
nomenclature plate.) Check also to see whether all
Figure 2-1 is typical for either container.
currently applicable MWO'S have been applied. (Cur-
b. Unpack a PSTS container as shown in figure 2-1.
rent MWO'S applicable to the equipment are listed in
c. Press transit case pressure relief valve.
DA PAM 310-7.)
d. Remove equipment from transit cases.
d. For dimensions, weights, and volume of pack-
aged items, see SB 700-20.
2-4. Checking Unpacked Equipment.
a. Inspect the equipment for damage incurred dur-
ing shipment. If the equipment has been damaged,

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business