Page Title: CHAPTER 1. INTRODUCTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6760-238-34
CHAPTER 1
INTRODUCTION
of an unsatisfactory condition with the equipment design
1-1. Scope
or use. It is not necessary to show a new design or list a
a. This manual contains direct support (DS) an
better way to perform a procedure, just simply tell why
general support (GS) maintenance for Test Set, Control
the design is unfavorable or why a procedure is difficult.
Panel, Focal Plane Shutter LS-78A (shutter test set). It
EIR may be submitted on SF 368 (Quality Deficiency
includes instructions appropriate to direct support and
Report)  Mail  directly  to:  Commander,  US  Army
general support maintenance for trouble shooting,
Communications and Electronics Matenel Readiness
testing, aligning and repairing the equipment, and
Command, ATTN: DRSEL-ME-MQ Fort Monmouth, NJ
replacing maintenance parts. It also list tools, materials,
07703 A reply will be furnished to you.
and test equipment for direct support and general
support maintenance.
b.
The complete technical manual for this
equipment includes TM 11-6760-238-12.
Special calibration procedures are not required for the
shutter test set.
NOTE
1-5. Shutter Test Set Component List
For applicable forms and records, refer
to TM 11-6760-238-12
The shutter test set major components and their
reference designations are listed in table 1 - 1.
1-2. Indexes of Publications
Table 1-1. Shutter Test Set Major Components List
a. Refer to the latest issue of DA Pam 310-4 to
determine whether there are new editions, changes, or
additional publications pertaining to the equipment.
Item
Reference designation
b. Refer to DA Pam 310-7 to determine whether
there are modification work orders (MWO's) pertaining to
Relay assy test board and compo-
the equipment.
nents assembly
A1
Control panel test board and com-
1-3. Reporting Equipment Improvement
ponents assy
A4
Recommendations (EIR)
Shutter assy test board and com-
EIR can and must be submitted by anyone who is aware
ponents assy
A8
Bndge assy
A10
1-1