Click here to make tpub.com your Home Page

Page Title: SELF-TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-3056-12
2-5.
SELF-TEST
Purpose
To ensure proper operation of the TS-3981 at the start of each day's testing.
Coverage
All circuits are checked except the monitor outputs (SCOPE, SYNC, FREQ MON, and
ERRORS).
Equipment
Banana patch cords (2 ea), 6 in. minimum length patch cords terminated in banana
Required
plugs (field wire may be substituted).
1.
Power
Connect TS-3981 to a source of power and set POWER to ON:
Green POWER indicator must light.
2.
Long
Set controls as follows:
Pattern
PATTERN
LONG
OPERATION
4W
CORRELATOR LOOP
OPEN
q
DATA ON/OFF
OFF
RATE SELECT
7 (32 kb/s)
DISPLAY SELECT
ERRORS
Use a banana patch cord to connect red (left) DATA OUT to red (left) DATA IN. Use a
banana patch cord to connect black (right) DATA OUT to black (right) DATA IN:
ACTIVITY indicator must not be lit.
Set DATA ON/OFF to ON:
ACTIVITY indicator must light.
Set RATE SELECT to positions 6 thru 1:
ACTIVITY indicator must remain lit at each position of RATE SELECT (except 0).
2-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business