Click here to make tpub.com your Home Page

Page Title: Table 6-2. Test Set Checkout Procedure-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-3023-14/ET904-AA-MMA-010/E154 TS3684/TO 33A1-12-1173-1
Table 6-2. Test Set Checkout Procedure - Continued
Test instructions
Normal indication
k. Connect positive lead to test point K,
negative lead to GRD.
(1)
Switch S4 to BULK position.
(1)
+500 VDC +/-8%
Switch S5 to OPEN position.
Press switches S2 and S3 at
same time.
CAUTION
Take readings within 10
seconds.
(2)
Switch S5 to SHORT position.
(2)
+10 VDC +/-10%
Press switches S2 and S3 at
same time.
(3)
Switch S4 to EXTERNAL
(3)
+140 VDC +/-8%
position. Switch S5 to OPEN
position. Press switches S2 and
S3 at same time.
(4)
Switch S5 to SHORT position.
(4)
+10 VDC +/-10%
Press switches S2 and S3 at
same time.
(5)
Switch S4 to COAX position.
(5)
+140 VDC +/-10%
Switch S5 to OPEN position.
Press switches S2 and S3 at
same time.
(6)
Switch S5 to SHORT position.
(6)
+10 VDC +/-10%
Press switches S2 and S3 at
same time.
1. Connect positive lead to test point D,
negative lead to GRD.
(1)
Switch S5 in SHORT position.
(1)
+385 VDC +/-5%
Switches S2 and S3 not
pressed.
(2)
Switches S2 and S3 pressed
(2)
+340 VDC +/-5%
at same time.
m. Test is completed, disconnect equipment.
6-16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business