Click here to make tpub.com your Home Page

Page Title: CHAPTER 2. SERVICE UPON RECEIPT AND INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-3023-14/ET904-AA/MMA-010/E154 TS3684/TO 33A1-12-1173-1
CHAPTER 2
SERVICE UPON RECEIPT AND INSTALLATION
Section I. SERVICE UPON RECEIPT OF MATERIAL
2-1.
Unpacking. No special instructions are required for unpacking the test set. Remove the test set from its
shipping container and perform the inspection given in paragraph 2-2.
2-2.
Checking Unpacked Equipment.
a.
Inspect the equipment for damage incurred during shipment. If equipment has been damaged, report the
damage on SF 364 (para 1-3b).
b.
Check the equipment against the component listing on the packing slip to see if the shipment is complete.
Report all discrepancies in accordance with paragraph 1-3c. The equipment should be placed in service
even though a minor assembly or part that does not affect proper functioning is missing.
c.
Check to see whether the equipment has been modified. Equipment which has been modified will have the
MWO number on the front panel near the nomenclature plate. Refer to DA Pam 310-14 to see whether all
currently applicable MWOs have been applied.
Section II. INSTALLATION INSTRUCTIONS
2-3.
Introduction. The electric surge arrestors (ESA) test set is a portable, self-contained test unit which does not
require permanent installation. The test set is used prior to the operation of equipment that has been relocated, and
periodically at specific predetermined intervals. This section contains the procedure for interconnection of the ESA test
cables and preliminary checks of the test set. No special tools or test equipment are required.
2-4.
Test Set Preliminary Check.
a.
Place the unit on a level surface which will allow the operator sufficient access to perform his functions.
b.
Depress the pressure relief valve located on the front of the equipment case (fig. 1-1), before opening lid,
to equalize internal and external pressures.
c.
Release the two front latches and lift the hinged lid.
d.
Perform test operating instructions described in chapter 3.
2-5.
Electrical Interconnection. The three test cables located in the cover compartment are supplied to test the
bulk, coaxial, or end of wir (EOW) line type ESA devices. Refer to chapter 3, section II, Operation for the electrical
interconnection to the particular ESA to be tested.
2-1/(2-2 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business