Click here to make tpub.com your Home Page

Page Title: EQUIPMENT SETUP
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-2885-30/NAVAIR 16-35TS3614-2
EQUIPMENT SETUP
a. BTS.
See TM 11-6625-2884-12 for BTS operating instructions.
q Remove
front cover of BTS.
q Release
fasteners and hinge back top (1) and side (2) cover plates
on BTS.
Connect BTS cables to the BTS connector panel (3) as follows:
Connect:
To Jack:
W11
J1 and J3
W6
J5
W7
J6
q Make
sure POWER 115 Vac and 28 Vdc circuit breakers (4) are OFF.
q Connect
the other end of W6 to 115 Vac 60 Hz.
Power Supply.
b.
q Connect
the other end of W7 to 28 Vdc power supply (PS), observing
polarity markings on cable.
FLTS .  Remove the FLTS cover and remove the transmitter, receiver, and
c.
cable assemblies.  Connect the following cables to their respective
jacks.
Video
Assembly
Receiver
1A2
1A1
1A3
BTS
Cable
Jack
Jack
Jack
Jack
BTS W11
1A2J1
J1 & J3
FLTS W2
1A2J2
1A1J1
FLTS W3
1A2J3
1A3J1
FLTS W4
1A1J2
1A3J2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business