Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ASSEMBLY PROCEDURE
Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

SECTION A (1) ASSEMBLY PROCEDURE: NOTE : Unit is partially disassembled to fit into preformed carton for shipping. TO REASSEMBLE: (See diagram K16200 Electric P.M. Tester) Components numbered on Diagram K16010, K16020. (-3 -11), (-3 -6) & (-8 -1) have been disassembled for shipping. (A) Place the mechanical top (K16010) into the cup (K16020) and place on Air Bath. (B) Install the main gas pipe (-3 -6) into the 1/4 pipe tee using a 3/4 Hex open end or adjustable wrench only, (DO NOT USE PIPE WRENCH) and tighten securely. (C) Place the  CUP holder (-3 -11) on the main gas (-3 -6) at a convenient height and tighten thumb screw. (D) Install the support rod (-8 -1) into the base tighten set screw in base (-0 -1) to secure rod. pipe and (E) Install the stirrer motor on the support rod (-8 -1). (F) Connect the flex cable from the mechanical top to the motor and adjust the motor to the angle shown in diagram. (G) Connect gas inlet to any regulated low pressure (5-10 p.s.i.) gas supply (such as L.P.G. or natural gas). Do not use direct unregulated pressure from an L.P.G. tank. Unit is now ready for operation. Proceed to instructions page (1).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business