Click here to make tpub.com your Home Page

Page Title: Table 3-37. Test Set Indicator Lamps Do Not Go On When 28 Vdc Power Is Jumpered To Test Point/Connector Contact Listed
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 1-6625-735-14
TABLE NO. 3-37.
Test Set Indicator Lamps Do Not Go On When 28 Vdc Power Is Jumpered To Test
Point/Connector Contact Listed. (Cont)
TEST OR INSPECTION
CORRECTIVE ACTION
2. Connect jumper between POWER 28 VDC STAB 1 and connector contact and/or
test point as listed. INDICATORS, corresponding to connector contact and/or test
point, shall light.
Step 1. If INDICATORS corresponding to connector contact and/or test point do not
go on, replace malfunctioning lamp and retest.
Step 2. If trouble remains, replace component board assembly A3.
CONNECTOR CONTACT (TEST POINT INDICATORS)
J1-C (NO. 1 INTLK 28 OS)
J2-C (NO. 2 INTLK 28 OS)
J1-A (NO. 1 INTLK 28)
J2-A (NO. 2 INTLK 28)
J1-BB (NO. 1 AUTO ENGA)
J2-BB (NO. 2 AUTO ENGA)
J1-GG (NO. 1 AUTO ENGA OS)
J2-GG (NO. 2 AUTO ENGA OS)
J1-V (NO. 1 DRVR SUPPLY)
J2-V (NO. 2 DRVR SUPPLY)
J1-B (NO. 1 DRVR SUPPLY OS)
J2-B (NO. 2 DRVR SUPPLY OS)
J1-s (NO. 1 UP LIMIT)
J2-s (NO. 2 UP LIMIT)
J1-E (NO. 1 STAB UP)
J2-E (NO. 2 STAB UP)
J1-D (NO. 1 STAB DN)
J2-D (NO. 2 STAB DN)
J1-t (NO. 1 DN LIMIT)
J2-t (NO. 2 DN LIMIT)
J3-E (SAS ENGAGE 2)
J3-G (SAS ENGAGE 1)
3-33

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business