Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. Operation Under Usual Conditions
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 1-4920-458-13&P Section III.  Operation Under Usual Conditions SECTION CONTENTS PARA PAGE OPERATING PROCEDURES 2-6 2-8 SHUTDOWN PROCEDURES 2-7 2-10 2-6. OPERATING PROCEDURES a. Place Tester on bench or platform where a source of DC or AC power is available. b. Connect  appropriate  power  source  to  connector  on  rear  panel  of  Tester  with  appropriate  power  cable  (and adaptor for single phase) per paragraph 2-2. c. Close all three instrument shut-off valves on top of operator panel to "OFF" position. d. Select aircraft instrument to be tested. CAUTION Vacuum   valves   must   be   open   when   operating   pressure   side;   pressure   valves   must   be   open   when operating vacuum side. e. Open "Control" and "Bleed" needle valves of opposite side of Tester selected. f. Set appropriate vacuum or pressure selector valve to instrument to be tested selection.  Make sure "Control" and "Bleed" needle valves to be used are both closed. 9. Open "shut-off" valve for appropriate aircraft instrument to be tested. h. Using hoses, connect instrument/aircraft  to  be  tested  to  appropriate  instrument  "Pitot  or  Static"  port  on  rear  of Tester. NOTE Altimeter and climb tests will be done using the "Static" port whereas airspeed tests will be done using the "Pitot" port. Appropriate hose(s) and fittings for these hook-ups are in the accessory storage compartment. i. Turn the power switch to "ON".  Indicator will light and motor/pump assembly will start. 2-8

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business